|
Motorised changeover switches
|
|
• 2 or 4 poles, from 40 to 160 A • Electric coil control • Position 1, 0 and 2 by remote control (ATyS M3) • Integrated measurement and control (ATyS M6) • Emergency manual operation • Padlocking function in position 0 (position I and II in option)
|
|
|
|
• 3 or 4 poles, from 125 to 3200 A • Isolation with positive break indication • Position 1, 0 and 2 by remote control • Integrated measurement and control (ATyS 6) • Emergency manual operation • Padlocking function in position 0 ( position I and II in option)
|
|
Control relays
|
|
• ATyS C40 to control the inverters in the case of specific normal/emergency between 2 generating sets
• ATyS C40 to control the inverters in the case of specific normal/emergency between 2
|
|
|
Configuration software
Manual changeover switches
|
|
• 3 or 4 poles; 2 positions (I-II) ou 3 positions (I-0-II, I-I+II-II, by-pass) • From 25 to 100 A; 5 ratings • Direct operation or external front operation
|
|
|
|
Manual Changeover switches SIRCO M from 25 to 100 A
• 3 or 4 poles
• Front direct handle or front external handle.
• Fully visualised breaking.
• DIN rail mounting, panel or modular panel with 45 mm front cut out.
|
|
|
|
|
• 3 or 4 poles; 3 positions (I-0-II or I-I+II-II) • From 63 to 125 A; 4 ratings • Direct or external front operation
|
|
|
|
• 3, 4, 6 or 8 poles; 3 positions (I-0-II or I-I+II-II) • From 125 to 1600 A; • Direct or external front operation
|
|
|
|
|
• 3-6 , 4-8 poles; 3 positions (I - 0 - II) • 3 positions (I - I+II - II) on request • From 125 to 1600 A; • Direct or external front operation
|
|
|
|
• 12+4 poles; • From 125 to 1600 A; • They are used to isolate a changeover switching device and changeover the load to an emergency supply.
|
|
|
|
|
• 3, 4 poles ; 3 positions (I-0-II)
• From 200 to 630 A
• Direct or external front operation
|
|
|
|